10
Getting Started Guide
•
Do not tamper with the equipment
•
Examine your work area for potential hazards (I.e. wet floors,
ungrounded cables, etc.)
For more safety information, please refer to the User’s Manual.
2.2 Recommended Installation Tools
You will need the following tools and equipment (not included) to
install the IntraCore 65120 switch:
•
Number 1, number 2 and 3/16-inch flat-
blade screwdrivers
•
Antistatic mat or foam
•
An ESD grounding strap
2.3 Power Requirements
The electrical outlet should be located near the IntraCore 65120
and be easily accessible. It must also be properly grounded.
Make sure the power source adheres to the following guidelines:
•
Power: Auto Switching 110/240 VAC
•
Frequency range: 50/60 Hz
•
Maximum input AC Current: 1.0A at 115 VAC full load
2.4 Environmental Requirements
The IntraCore 65120 must be installed in a clean, dry, dust-
free area with adequate air circulation to maintain the following
environmental limits:
•
Operating Temperature: 0° to 40° C (32° to 104° F)
•
Storage Temperature: -20° to 70° C (-4° to 158° F)
•
Relative Humidity: 10% to 90% non-condensing
•
Storage Relative Humidity: 10% to 95% non-condensing
Summary of Contents for IntraCore 65120 Series
Page 1: ...IntraCore 65120 Series Gigabit Ethernet Switches Getting Started Guide...
Page 4: ...4 Getting Started Guide...
Page 8: ...8 Getting Started Guide...
Page 18: ...18 Getting Started Guide...
Page 20: ...20 Getting Started Guide...
Page 22: ...22 Getting Started Guide...