[AKD4382A-SB]
<KM089400> 2
2007/06
Operation sequence
1) Set up the power supply lines. (See “Other jumpers set-up”.)
Name Color Voltage
Comments
Attention
+15V Red
+12
∼
+15V
For regulator and op-amps.
This jack should be always connected to power
supply.
-15V Blue
-12
∼
-15V
For op-amps.
This jack should be always connected to power
supply.
AGND Black 0V
GND
This jack should be always connected to power
supply.
Table 1. Set up of power supply lines
Each supply line should be distributed from the power supply unit.
2) Set-up the jumper pins
3) Set-up the DIP switches. (See the followings.)
4) Power on
The AK4382A should be reset once by bringing SW1 (PDN) “L” upon power-up.