
cFP-2200/2210/2220
20
ni.com
Complete the following steps to connect power supplies to the controller.
1.
Install the ferrite 2–3 in. from the ends of the power wires. Wrap the
wires around one side of the ferrite so that they pass through the ferrite
twice, as shown in Figure 22.
Figure 22.
Wrapping the Power Wires around the Ferrite
Figure 23.
Closed Ferrite
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com