background image

www.arthrex.com

© 2020 Arthrex, Inc. All rights reserved. LI1-000123-en-US_A

1. Place Synergy

ID

 console (CCU) on tower shelf and 

connect power cord to the back of the console

2. Attach monitor to the tower and connect monitor DC 
power cable to the rear panel of the monitor

3. Attach Synergy tablet to tablet arm and connect the 
cable from the docking station to the rear panel of the 
Synergy console labeled “TABLET” as shown

4. Using the provided video cable, connect one end to 
the rear panel of the console labeled “DISPLAY PORT 1” 
as shown

5. Connect the other end of the video cable to the rear 
panel of the monitor labeled “VIDEO INPUT”

6. Attach provided trigger cable from back of laser light 
source to the console labeled “LASER” (only needed if 
fluorescence imaging is desired)

7. Connect the laser light source to power (only needed if 
fluorescence imaging is desired)

8. Place printer on tower shelf and connect power 
cord to power supply and USB cable to the rear of the 
Synergy

ID

 console

9. Press the LED “ON” button on the front of the CCU to 
turn the light source on 

Synergy

ID

 Quick Set Up Guide

Printer

Synergy Laser Light Source

Synergy 4K Monitor

Tablet

Reviews: