B.
Harness ELT D-Sub Plug Sealing
1)
After system operation is verified, with no errors displayed, it is suggested that the harness connector to the
ELT be sealed against moisture. This is best accomplished by encapsulating the exposed connections in
silicone sealant. ACR recommends Dow Corning® 4 Electrical Insulating Compound or an equivalent meeting
SAE AS-8660 (MIL-S8660C)
a)
Disconnect the remote switch harness D-Sub plug from the ELT.
b)
Separate the D-Sub housing halves.
c)
Inject sealant into the back side of the plug, so that sealant surrounds all exposed electrical connections
and the back of the plug.
d)
Reinstall the housing halves.
e)
Coat the mating pins/receptacles lightly with sealant.
f)
Re-connect the harness plug to the ELT.
C.
Installation Documentation
1)
Update logbook (aircraft records) entries and submit FAA Form 337, along with any supporting data required
by the FAA for approval of the installation, as applicable.
2)
In countries other than the United States, make appropriate aircraft records entries and submit documentation
as required for installation approval in accordance with national regulatory authorities.
8.
Battery Pack Installation
A.
Battery Installation and Reinstallation
CAUTION:
THE BATTERY PACK CONTAINS ELECTROSTATIC DISCHARGE SENSITIVE (ESD)
COMPONENTS AND, AS SUCH, MUST BE HANDLED WITH CARE. IF POSSIBLE, WEAR A
GROUNDED WRIST STRAP WHEN HANDLING THE BATTERY PACK DURING INSTALLATION
ACTIVITIES. TAKE PARTICULAR CARE TO AVOID TOUCHING THE EXPOSED CIRCUIT BOARD
AND CONNECTOR PINS ON THE BOARD.
1)
This subtask applies to reinstallation of an existing battery that was removed for inspection and testing, as well
as fitting a new battery.