Chapter 4
AXP640 Installation and Use (6806800M24F)
103
AXP640 Operations
4.1
Overview
This chapter provides the basic operating procedures for the AXP640. For software-specific
information, or information regarding the operation of third-party or add-on components,
please refer to the software or hardware product’s vendor documentation. You can refer to
for a collection of supporting manuals.
This chapter covers the following topics:
Recommended Power-On Procedures
4.2
Recommended Power-On Procedures
The following sections describes the startup procedure for AXP640 AC and AXP640 DC
systems.
4.2.1
AC System Startup Procedure
Procedure
Depending on the system configuration, the actual powering up may take up to 3 minutes.
Make sure that the system has been placed in a location at room temperature for at least 24
hours before powering it up.
1. Mount the grounding cable to the Protective Earth connection lug if not done
already.
2. Make sure that the external power feeds you plan to attach are powered off and
Summary of Contents for AXP640
Page 1: ...AXP640 Installation and Use P N 6806800M24F May 2014 ...
Page 8: ...AXP640 Installation and Use 6806800M24F Contents 8 Contents Contents ...
Page 10: ...AXP640 Installation and Use 6806800M24F 10 List of Tables ...
Page 50: ...Platform Architecture AXP640 Installation and Use 6806800M24F 50 ...
Page 70: ...AXP640 Shelf Description AXP640 Installation and Use 6806800M24F 70 Figure 2 14 AC Inlet 220V ...
Page 101: ...Site Preparation AXP640 Installation and Use 6806800M24F 101 Figure 3 13 Planning Checklist 2 ...
Page 102: ...Site Preparation AXP640 Installation and Use 6806800M24F 102 ...
Page 112: ...AXP640 Operations AXP640 Installation and Use 6806800M24F 112 ...
Page 136: ...AXP640 Shelf Installation AXP640 Installation and Use 6806800M24F 136 ...
Page 164: ...FRU Installation AXP640 Installation and Use 6806800M24F 164 ...
Page 186: ...Shelf Management Alarm Module AXP640 Installation and Use 6806800M24F 186 ...
Page 189: ......