background image

 

 

 
 
 
 
 
 
 
 

saTECH TSB-14-H/V 

saTECH TSB-14-P-H/V 

 

 

Summary of Contents for saTECH TSB-14-H

Page 1: ...saTECH TSB 14 H V saTECH TSB 14 P H V...

Page 2: ...d obligations of Arteche Smart Grid SL including settlements of warranties they result solely from the applicable purchase contract which is not affected by the contents of the manual All trade names...

Page 3: ...saTECH TSB 14 H V saTECH TSB 14 P H V Rev 1 2 3 Chapter 1 Overview 4 Chapter 2 Cautions 6 Chapter 3 Main features 7 Chapter 4 Applicati n 8 Chapter 5 Dimensions installation and connections 16 Chapter...

Page 4: ...G These test blocks facilitate secondary testing load of any power system allowing rapid monitoring insulation and testing of the field elements The box contains saTECH TSB 14 Set of cabinet fixing sc...

Page 5: ...ury or even death General Safety instructions The installation and operation of the products described in this manual can be made only by trained personnel who have expertise in substation protection...

Page 6: ...cation these were carried out according to point 10 6 4 3 7 of the IEC60255 27 standard 2014 75 of the value of dielectric strength established 4 The test blocks are electrical equipment Therefore wro...

Page 7: ...onfiguration can t be modified Safe for the user the user will never have access to live parts during insertion or extraction of the test plug Safe insertion sequence make before break The trip circui...

Page 8: ...cuits which can be accessed by removing the front cover The front cover guarantees an IP50 and its removal allows access to the internal circuitry to enable testing operations All of these circuits in...

Page 9: ...labels frame This identification is visible even when the test plug is inserted The user will define what kind of circuit trigger voltage or current wants in each position at the moment of ordering th...

Page 10: ...nvoluntary extractions turning the black buttons of the test block There are 28 banana plugs in the test plug which allow the use of safety banana plugs 14 banana plugs of 4mm are used for the test in...

Page 11: ...ce to do the extraction of the test plug with the following sequence First phase 1 Connect the current and voltage circuits 2 Opening of the short circuit current transformers Second phase 3 Connectin...

Page 12: ...n will allow voltage and current values to stabilize after transients during the connection and will avoid unwanted tripping during the trigger circuit connection During the insertion and the extracti...

Page 13: ...TECHNICAL SPECIFICATIONS saTECH TSB 14 H V saTECH TSB 14 P H V Rev 1 2 13...

Page 14: ...saTECH TSB saTECH TSB P IEC 60947 7 1 All circuits 20A allow continuously or 400A for 1s All circuits 10A allow continuously or 250A for 1s Maximum operating voltage saTECH TSB TSB P 300 volts ac or...

Page 15: ...ATIONS saTECH TSB 14 H V saTECH TSB 14 P H V Rev 1 2 15 MODEL SELECTION 1 Horizontal position Reading from right to left The shorting circuits must be placed in a row e g 2 Vertical position Reading f...

Page 16: ...TSB 14 P H V Rev 1 2 16 Chapter 5 Dimensions installation and connections DIMENSIONS CUT OUT 45mm TSB 14 111111ABAAAB Net weight 1800 gr Gross weight 2500 gr Package 320 x 250 x 440 TSB P Net weight 6...

Page 17: ...ical option the odd circuits field must be located in the right side and the numbers disposition will be top down In the horizontal option the odd circuits field must be at the bottom and the pairs at...

Page 18: ...to 4mm2 or 12 AWG 3 Maximum outer diameter of annular connector 9mm 4 With block type tests are supplied Phillips head M4 screws 5 The maximum torque for the screws is 2 5N Earth connection After the...

Page 19: ...TECHNICAL SPECIFICATIONS saTECH TSB 14 H V saTECH TSB 14 P H V Rev 1 2 19 CONNECTIONS The maximum and minimum dimensions of annular connectors recommend to be used in the back of the test block are...

Page 20: ...TECHNICAL SPECIFICATIONS saTECH TSB 14 H V saTECH TSB 14 P H V Rev 1 2 20 APPLICATION EXAMPLE...

Page 21: ...sition of metal particles in the interruption plastic zone of the circuits The following picture shows fingers which have not been cleaned and serviced and where the deposition of material can be appr...

Page 22: ...www arteche com Arteche...

Reviews: