
Assembly Instructions
Laverne
7
Step 1: Cabinet Shell
6x35 Cam Bolt
x2
c1
8x30 Dowel Pin
x10
d1
3.5x16 Screw
x6
s1
Lift Rail
(Right)
x1
Lift Rail
(Left)
x1
Attach 2
c1 Cam Bolts
and 4
d1 Dowel Pins
to
Panel Z.
Attach
Lift Rail (Right)
to
Panel Z
using
s1 Screws.
NOTE:
There are two pre-drilled holes for the lift rail: top and bottom. Affix these screws
first, and then add a third screw in the center of the lift rail.
Attach 6
d1 Dowel Pins
to
Panel Y.
Attach
Lift Rail (Left)
to
Panel Y
using
s1 Screws.
NOTE:
There are two pre-drilled holes for the lift rail: top and bottom. Affix these screws
first, and then add a third screw in the center of the lift rail.
Z
Y
TIP:
Spray a small amount of
WD-40 or similar lubricant onto a
paper towel and wipe the newly
installed rails. This will make lift
installation and operation easier.