Now, it is time to place the arm to arm Intermediate
Kevlar Support cords as shown in fig.9
Front of beam
Support Cords are mounted between
the two arms in front of the beam.
Note: Coax Standoffs are on
the back of the beam
VHQ BEAM ORIENTATION
Fig.9