Armstrong International
IOM-706 V2.0
Flo-Direct Water Heater
Page 13 of 45
Installing Small Heaters
1
Place lower canister in final heater position:
• On level surface
• With adequate clearances
• With adequate support for operating weight
• With outlet facing transfer pump location
• Not near flammable or combustible materials
To transfer
pump
2
Wipe flange and gasket to remove any dirt
or debris and place gasket on flange of
18"
48"
canister with holes aligned.
3
Move upper canister
into position over lower
canister using lift lugs.
(sides and
back)
Wall
(front)
4
Lower carefully until a few bolts can be inserted.
Tip
: Using several tapered pry bars or long
screwdrivers will aid in aligning.
Note
: Control panels are typically above
standpipe (see approval drawing for actual
orientation). If slight indexing is required to
align outlet, some rewiring may be necessary
between canister sections.
5
Lower upper canister completely, insert all
bolts, and start nuts. Liberal application
of an anti-sieze compound is strongly
recommended.
6
Raise entire heater slightly above floor to
allow self-aligning.