![Armstrong EHU-700 Series Installation And Maintenance Manual Download Page 32](http://html1.mh-extra.com/html/armstrong/ehu-700-series/ehu-700-series_installation-and-maintenance-manual_2974153032.webp)
12) Reassemble tank. Make sure o-rings are still on electrode terminals. Also check condition of steam
generator o-ring. After a couple cleanings, it will need to be replaced. Make sure o-ring is sealed in
its groove and not pinched when halves are put together. Do not over-tighten nuts that hold
electrodes in place. This is an o-ring seal so nuts should be "snug".
13) Re-install the steam generator tank. Check out for proper operation.
32