Supplied By www.heating spares.co Tel. 0161 620 6677
user’manual
Dear Customer,
Thank you for choosing an ARISTON boiler.
We guarantee that your boiler is a reliable and technically sound product. This manual provides detailed
instructions and recommendations for proper installation, use and maintenance.
Remember to keep this manual in a safe place for future reference i.e. by the gas meter.
Your local MTS Servicing Centre is at your complete disposal for all requirements.
The installation and first ignition of the boiler
must be performed by qualified personnel in
compliance with current national regulations
regarding installation, and in conformity with
any requirements established by local authorities
and public health organisations.
After the boiler has been installed, the installer
must ensure that the end user receives the
declaration of conformity and the operating
manual, and should provide all necessary
information as to how the boiler and the safety
devices should be handled.
This appliance is designed to produce hot water for
domestic use.
It should be connected to a heating system and a
distribution network for domestic hot water, both of
which must be compatible with its performance and
power levels.
The use of the appliance for purposes other than
those specified is strictly forbidden. The manufacturer
cannot be held responsible for any damage caused
by improper, incorrect and unreasonable use of
the appliance or by the failure to comply with the
instructions given in this manual.
Installation, maintenance and all other interventions
must be carried out in full conformity with the
governing legal regulations and the instructions
provided by the manufacturer. Incorrect installation
can harm persons, animals and possessions;
the manufacturing company shall not be held
responsible for any damage caused as a result.
In the event of any maintenance or other structural
work in the immediate vicinity of the ducts or flue
gas exhaust devices and their accessories, switch
the appliance off by switching the external bipolar
switch to the “OFF” position and shutting off the gas
valve.
When the work has been completed, ask a qualified
technician to check the efficiency of the ducting and
the devices.
If the boiler should be out of use for a prolonged
period, it is recommended that the electrical power
supply be disconnected and that the external gas
cock be closed. If low temperatures are expected,
the boiler and system pipe work should be drained
in order to prevent frost damage.
Turn the boiler off and turn the external switch “OFF”
to clean the exterior parts of the appliance.
Do not allow children or inexperienced persons to
use the appliance without supervision.
CE labelling
The CE mark guarantees that the appliance conforms
to the following directives:
-
90/396/CEE
relating to gas appliances
-
2004/108/CEE
relating to electromagnetic compatibility
-
92/42/CEE
relating to energy efficiency
-
2006/95/CEE
relating to electrical safety