
12 - GB
installation
Warning!
Installation should be performed by a
qualifi ed technician.
Before making any connections, shut
off electrical power to the heat genera-
tor with its external two-position switch.
Wall installation
- Open the cover by pressing lightly on
the tab at the bottom of the receiver
(Fig. 3).
- Fix the receiver's base to the wall at the
chosen position, using the plugs and
screws supplied with the kit (Fig. 4).
Fig.
4
Fig.
3
RED LED
GREEN LED
BUTTON
Fig.
5
Summary of Contents for 3319121
Page 87: ... 87 ...