DV-38
System Installation Manual
EQUIPMENT REQUIREMENT
Prior to installation, carefully inspect all packages for evidence of damage.
Compare the equipment received against equipment ordered to ensure that
ALL components have been received.
The following materials are required (not provided) for installation:
z
Exterior grade plywood back board for the KSU.
z
1 Male-Tail per extension board for Station wiring.
z
Appropriate mounting hardware.
13
Arista Systems Corporation