Quick Start Guide: 7500 Series Modular Data Center Switches
17
Chapter 4
Cabling the Switch
4.1
Cabling the AC Power Supply
4.1.1
Grounding the Switch
After mounting the switch into the rack, connect the switch to the data center ground.
Figure 4-1
displays the location of the grounding pads located on both sides of the power input sockets.
Figure 4-1: Grounding Pad and ESD Grounding Port Sockets
After the switch is grounded, ESD wrist straps can be grounded by connecting them to one of the ESD
grounding ports located between the power input sockets, (
Figure 4-1
) or the rear panel (
Figure 4-2 on
page 18
depicts the location on the 7504). Receptacles are available in similar locations on other switch
models.
INPUT
PS 4
200-240V AC~
50/60Hz 16A
INPUT
PS 3
200-240V AC~
50/60Hz 16A
INPUT
PS 2
200-240V AC~
50/60Hz 16A
INPUT
PS 1
200-240V AC~
50/60Hz 16A
Grounding Pad
Grounding Pad
ESD Grounding Port