![Arista 7280 Series Quick Start Manual Download Page 40](http://html.mh-extra.com/html/arista/7280-series/7280-series_quick-start-manual_2970764040.webp)
Figure 33: Four-Post Rack Mount Parts
1
Rail-slide
2
Rail-rod
3
Rack plugs (detail)
4
Rail (assembled)
B.2
Cables
Lists the cables required for installation of the device.
Quantity
Description
2
Power cables: IEC-320/C13-C14, 13 A, 250 V
1
RJ-45 Patch Panel Cable
1
RJ-45 to DB9 Adapter Cable
Warning: All provided power cables are for use only with Arista products.
B.3
Ground Extender Kit (Optional)
Lists the cables required for installation of the device.
SKU
Description
KIT-GND-EXT-1RU
1
Ground extender kit for NEBS compliance
1. Available only for certain devices.
36