![Aries 931213 Installation And Operation Manual Download Page 12](http://html1.mh-extra.com/html/aries/931213/931213_installation-and-operation-manual_2970287012.webp)
Hold the UV lamp by the plastic ends ONLY. To
H]VPKVPSZHUKÄUNLYWYPU[ZP[PZYLJVTTLUKLK[V\ZL
gloves when handling the UV bulb. DO NOT touch
the glass. If the lamp should become oily or dirty,
clean it with a clean soft tissue or cloth wetted with
isopropyl alcohol.
First, slide the O-ring gasket of the male, pronged
end of the UV bulb until it seats. Second, place
washer on top of gasket. Third, place the blue collar
on top of the gasket.
Connect the female wire connection to UV male prong
until it is fully seated.
Install the bulb into the stainless-steel chamber. Gently
thread the blue collar until hand tight.
Gently push UV body back into the bracket. Squeeze
JSHTWZ\U[PS[OLJSPJRÄYTS`HIV\[[OL<=IVK`
Replace the top cover and turn the unit on.
START UP PROCEDURE
Plug in the unit. The electrical outlet should be prop-
erly grounded and fused. It is recommended that the
system run on its own dedicated electrical circuit.
Open outlet valve and place a container underneath.
Slowly turn on the water supply to the unit and correct
any leaks at the supply connections.
Turn unit on at the power switch and allow water
[VÅV^>H[LY^PSSIL]PZPISLÄSSPUN[OLJHY[YPKNLZ\W
ÅV^MYVT[OLSLM[[V[OLYPNO[(SSV^[OLHPY[VISLLK
from the system through the outlet valve into the
open container.
When all air has been purged from the system close
the outlet valve.
0UZ[HSS[OLÄUHSJHWZ\SLÄS[LYVU[OLV\[SL[]HS]L6WLU
[OLV\[SL[]HS]LHUKISLLKVќHU`YLZPK\HSHPYPU[OL
ÄS[LYI`VWLUPUN[OL[O\TIZJYL^VU[OLZPKLVM[OL
ÄS[LY*SVZL[O\TIZJYL^^OLU^H[LYPZWYLZLU[HUK
close the outlet valve.
Check connections and cartridges for leaks.
“INITIAL POLISHING” OF NEW CARTRIDGES
Cartridge may require up to 24 hours to rinse up to
18 Megohms.
SP[LYZVM^H[LYZOV\SKILY\U[OV\NO[[OLÄS[LYZHZHU
initial purge of the system.
We recommend a sample be collected in an
appropriate sterile sample container and tested for
water purity. Periodic laboratory water testing to
JVUÄYT[OLLќLJ[P]LULZZVM[OL[YLH[TLU[WYVJLZZPZ
the owners’ responsibility.
7 /
A R I E S H I G H P U R I T Y WAT E R S Y S T E M
Summary of Contents for 931213
Page 2: ......
Page 20: ...DATE MAINTENANCE PERFORMED BY COMMENTS...
Page 21: ...DATE MAINTENANCE PERFORMED BY COMMENTS...
Page 22: ...DATE MAINTENANCE PERFORMED BY COMMENTS...
Page 23: ......