9 - 34
9.5 DEFLECTOR
To install a new deflector cable: (Figure 31)
1. Remove e-ring and flat washer from stud on
discharge chute.
2. Route deflector cable between the chute and the
chute pedestal.
3. Slide cable end through hole on bracket on left side
of chute.
4. Attach cable eye to stud on deflector. Hold in place
with flat washer and e-ring.
5. Check deflector travel. Adjust nut on cable end
under handle bar to obtain full travel.
Figure 31
9.6 RUNNERS
Runners should be adjusted as conditions require.
Raising or lowering runners controls distance scraper
blade is held above surface being cleared.
When operating machine on gravel surface, lower
runners so that housing will not pick up gravel. On
concrete, blacktopped or packed down snow surfaces,
raise runners so that scraper blade scrapes clean. To
reduce tendency of housing to ride up over heavy wet
or hard-packed snow, remove runners and re-install
with the narrow edge down.
Position unit on a flat level surface. Adjust runners by
inserting a spacer of desired thickness under center of
scraper blade, loosen hardware, slide runners to flat
surface and retighten hardware.
NOTE: Above method keeps housing level by adjust-
ing runners equally. Uneven runners make machine
difficult to steer and results in uneven clearing.
1
2
3
PS1091
1. Deflector Cable
2. Chute Rod
3. Compression Spring
CAUTION: Adjust auger/impeller housing
height to clear gravel or crushed rock
surfaces.
Summary of Contents for 924 Snow-Thro
Page 40: ...11 40 Model 924517 PS0891 PS0850...
Page 41: ...11 41 Model 924516 PS0672...