04
11
-۹٠۹٠WS
K
INSTALLATION PROCESS
M 6 X 3 5
STEP 1
STEP 2
STEP 3
1.Assembly of tray
If the ground is not smooth,please adjust
the nail under the tray to keep the balance
of the tray and ground.
2 Install the shower body
Follow the installation process install
the left and right side shower body,fix
it with ST4*20 screws.
3. Install the shower body onto the tray
Put the shower body onto the tray,fix it.
Model
Top light
20W
AC12V
AC12V
DC12V
DC12V
DC12V
KL-824
110V
25A
2650W
Ip4
Voltage
Sidelight
5W
Current
Fan
3.5W
Power
Water inlet valve
6W
protecting electrifying
Water drain valve
7W
Waterproof Grade
I
6
、
Technical parameter
Attention:
The machine must be fixed in the circuit which protected
by creepage protectionand should be well-connected with the
ground. Nontechnical people can not be fixed or removed at
random.