background image

R-20 SM 

 

 

 

 

 

 

 

 

5. TROUBLESHOOTING 

 

 

Problem 

Cause 

Check 

Solution 

Valve does not open 

1.

 

The Inlet pressure is 
too low 

1.

 

Check the inlet 
pressure 

 

1.

 

 Make sure that the water supply 
(or the pump) is on. 

2.

 

The 

3

-Way selector 

(

3

) is set to "close". 

2.

 

Check the position of 
the 

3

-way selector (

3

2.

 

 Turn the 

3

-Way selector (

3

) to 

"auto". 

3.

 

Blocked pilot 

3.

 

No water coming out 
of the pilot port #

4

3.

 

 Contact  A.R.I.’s field service 

4.

 

The pilot’s adjusting 
bolt (

4A

) is 

completely close  

4.

 

Check the position of 
the pilot’s adjusting 
bolt (

4A

)  

4.

 

 Turn the adjusting bolt (

4A

counter-clockwise, one turn at a 
time, allowing sometime between 
turns for the valve to respond. 
Continue until the required 
pressure is reached. 

Valve does not close 

1.

 

Debris on the sealing 
seat 

1.

 

The valve is constantly 
discharging small 
amount of water 

1.

 

  Turn the 

3

-way selector (

3

) to 

"open" for 

5

 seconds, and then to 

"close". 
If the problem continues, turn off 
the water supply to the valve.  
Remove the bonnet and 
diaphragm, remove the foreign 
object, and check that the 
diaphragm, body and cover are not 
damaged. 

2.

 

The diaphragm is 
damaged 

2.

 

The valve is constantly 
discharging small 
amount of water 

2.

 

 Turn off the water supply to the 
valve.  Remove the bonnet and 
replace the diaphragm. 

3.

 

The 

3

-Way selector is 

in the "open" 
position. 

3.

 

Check the 

3

-way 

selector. 

3.

 

 Turn the 

3

-Way selector (

3

) to 

"auto" or "close" position 

4.

 

Blocked self-flushing 
filter (

2

). 

4.

 

Disconnect the 
control tube from the 
self-flushing filter (

2

and check for free 
water flow. 

4.

 

 Turn off the water supply to the 
valve, remove the finger-filter and 
clean or replace it. 

Unstable upstream 
pressure  

Blocked or damaged 
pilot 

Unstable pressure 
upstream of the valve 

Contact A.R.I.'s field service  

Incorrect but stable 
upstream pressure 

Wrong preset pressure 

 

Readjust the upstream pressure as 
described in the Initial Set-up chapter 
(

2.4

).  

 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Eliptix R-20-SM 3W

Page 1: ...transmission and waterworks systems for irrigation landscape and infrastructure applications The R 20 series has an innovative elliptic shaped diaphragm that integrates well with a wide variety of reg...

Page 2: ...peration 6 2 INSTALLATION 7 2 1 Pre installation requisites 7 2 2 Installation procedure 8 2 3 Initial Start up The Control Valve 9 2 4 Initial Set up The Pressure Reducing Application 10 3 OPERATION...

Page 3: ...ever whether caused by accessing and or relying upon this Disclaimer and or in any document enclosed hereto including without limitation any links procedures or materials A R I shall NOT assume any li...

Page 4: ...prior warning Make sure that allproducts outlet portsarenotdirectedtowardelectricalelements pumps orpeople 8 Always open and close valves slowly and gradually 9 Please note that the maximum working pr...

Page 5: ...lations set for handling this type of fluid 3 Before disconnecting the product from the system and before releasing the residual pressure do NOT loosen or unscrew the product bolts removeanyprotection...

Page 6: ...ns 2 Make sure that all the tools ladders lifting devices etc used during the maintenance procedures are taken away from the product area and stored 3 Remove grease and fat material residues in order...

Page 7: ...2 Before installing the valve flush the pipeline to remove scale dirt and other particles that might affect the valve performance 3 Carefully remove the valve from the shipping package Unload all valv...

Page 8: ...wing valves Isolation valves upstream and downstream of the control valve 2 2A Air valves upstream and downstream of the control valve 5 3 Turn the 3 way selector 3 to its CLOSE position and turn on t...

Page 9: ...solation valve 2A 6 Turn adjusting screw 4B counter clockwise one turn at a time allowing sometime between turns for the valve to respond until the upstream pressure reaches the required level water s...

Page 10: ...the pilot decreases the internal pressure of the control chamber by releasing water out to the atmosphere through port 4 causing the valve s diaphragm to slightly open and decrease the upstream pressu...

Page 11: ...is reached 8 To decrease upstream pressure turn the adjusting bolt 4B counterclockwise one turn at a time allowing sometime between turns for the valve to respond Downstream pressure is shown on the...

Page 12: ...ally inspect the valve s diaphragm for any tears 2 Every 12 months inspect the valve s operation and clean the Finger Filter 3 Check the downstream pressure adjust if required 4 2 Storing the valve It...

Page 13: ...ector 3 to open for 5 seconds and then to close If the problem continues turn off the water supply to the valve Remove the bonnet and diaphragm remove the foreign object and check that the diaphragm b...

Page 14: ...R 20 SM 6 DIMENSIONAL DRAWING...

Page 15: ...le nor does this warranty extended to any consequential or incidental damages or expenses of any kind or nature regardless of the nature thereof including without limitation injury to persons or prope...

Reviews: