![Argweld Multi Exhaust User Instructions Download Page 8](http://html1.mh-extra.com/html/argweld/multi-exhaust/multi-exhaust_user-instructions_2969520008.webp)
PAGE 8
Deflation is usually carried out by detaching the inert gas inflation line
from the supply. The inert gas will simply flow out of the inert gas
connector and the dams will collapse allowing them to be easily removed.
Another perfect pipe weld!
Do not use “makeshift” devices like cardboard dams or foam bungs.
They contain a lot of water, water vapour and air, put your weld at risk
and end up costing you more money.
Use the proper tool for the job!
WARNING
Failure to comply with these instruction procedures may lead to
damage being caused to the dam assembly which may not be
covered by our warranty terms.
SIMPLE STEPS
Continued
COMPARATIVE EXAMPLES
OF PURGE TIME
REPLACEMENT DAMS
In the event of one of the dams being damaged, replacement dams
are available.
The dams are easily changed.
Please contact us or your local distributor for information.
Pipe
Length
Pipe
Diameter
Normal Purge
time at 10 L/
min (168 cfh)
Argweld
®
Time at 10 L/
min (168 cfh)
10 m
(33")
100 mm
(4")
26 min
1.5 min
10 m
(33")
200 mm
(8")
83 min
4 min
10 m
(33")
300 mm
(12")
173 min
8 min