Assembly Instructions
11
Step
16
Step
17
C
C
C
B
Q
1
Prepare the left side
Screw 3 large metal
dowels into the holes
shown on the left side
. .
Note:
Tighten the metal
dowels up fully against
the panels.
Push 2 hollow core
locking nuts into the
left side , making sure
that they are flush
against the panel’s
surface.
Using a hammer, tap in
the pin on the hollow
core locking nut .
Note:
The pin should be
tapped in flush with the
top surface of the hollow
core locking nut .
Fit 2 hinge plates onto
the left side , making
sure that the slot is
facing towards the
finished front edge.
1
1
1
B
C
C
C
Q
Prepare the right side
Screw 3 large metal
dowels into the holes
shown on the right side
. .
Push 2 hollow core
locking nuts into the
right side , and fix
them as you did in step
15.
Fit 2 hinge plates onto
the right side , making
sure that the slot is
facing towards the
finished front edge.
4
B
4
C
4
Q
C
C
Q
Q
B
B
B
1
C
C
Q
Q
B
B
B
4
4
Q