
Assembly Instructions
4
If you have damaged or missing components, call the
Customer Helpline: 03456 400800
quoting the reference
numbers below
Step
1
x 5
B
Prepare the drawer
fronts
Screw 2 metal dowels
into the holes shown on
the back of each drawer
front .
Note:
Tighten the metal
dowels up fully against
the panels.
B
5
Prepare the drawer
sides
Insert a small locking
nut into the hole
shown on the left drawer
side and right drawer
side .
Note:
Arrow on locking
nut
must
point towards
hole in edge of panel.
E
7
8
Step
2
Step
3
B
B
5
Attach the drawer
sides to the drawer
front
Push the left drawer side
. and right drawer side
. onto the back of the
drawer front .
Turn the small locking
nuts on the left
drawer side and right
drawer side .
Note:
Turn the locking
nuts clockwise to
secure panels - more
than 1/2 a turn.
7
8
5
E
7
8
E
x 5
x 5
x 5
Note:
The locking nuts can be on
either surface of the drawer sides.
Make sure that the small groove
is on the inside, as shown.
E
B
B
E
Small groove
9
Note:
Due to the manufacturing process, the holes for the
locking nut can be on either surface of the drawer sides.
E
E
7
8
8
7
5