![Argos Home Venice 803/8304 Assembly Instructions Manual Download Page 10](http://html1.mh-extra.com/html/argos/home-venice-803-8304/home-venice-803-8304_assembly-instructions-manual_2968170010.webp)
Finished
front edge
Finished
front edge
Assembly Instructions
9
Step
10
Step
11
Prepare the top
Screw 6 small metal
dowels into the holes
in the top .
Fit the bracket from the
overbalance protector kit
. to the shallow
mark-hole drilled into the
top using 1 of its
screws.
Note:
Only fit 1 of the
screws, the other 1 will
be fitted later.
L
11
11
Q
Finished
front edge
Q
L
L
L
L
L
11
Fit the right side to
the top
Slide the right side
onto the top .
The 2 hollow core locking
nuts fitted to the right
side must slide over
the 2 small metal dowels
. fitted to the top .
Insert a screwdriver into
the 2 hollow core locking
nuts and turn the nuts
inside as far as they will
go.
8
11
L
K
K
L
8
11
K
K
CR
11
8
L
L