D
D
Assembly Instructions
8
Step
10
Prepare the right side
a:
Fit 3 runners to
the right side .
The 1st screw uses
the 1st hole in from the
front of the runners.
The 2nd and 3rd screws
. use the holes that line
up with the other panel
holes.
b:
Fit a screw into
the 2nd hole in at the top
of the runners .
Insert 2 large locking
nuts into the right
side .
Tap 4 wooden dowels
into the right side .
P b
2
K
K
J
B
2
D
2
P b
P b
J
P b
K
K
1st
screw
2nd
screw
K
3rd
screw
J
J
J
K
K
P b
K
K
K
P b
K
K
K
P b
K
B
B
D
D
2
2
Finished
front edge
Finished
front edge