![Argos 7202007 Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/argos/7202007/7202007_assembly-instructions_2968058003.webp)
Dia 8
-6-
1. The front flap can be zipped open and
tied up if required (Dia 8). The cover
can be attached to the frame by four
ties at the base. Then place the unit in
the desired location. See Dia 8
Care and Maintenance
Safety
To avoid and risk of suffocation to animals or children dispose of the plastic bags immediately.
Cleaning
As with all surfaces clean with a damp cloth and mild detergent, do not use bleach or abrasive
products.
2 Tier Mini Greenhouse- Assembly Instructions
Stage 4 - Finishing the Unit