![Argo ZORI Operating Instructions Manual Download Page 7](http://html1.mh-extra.com/html/argo/zori/zori_operating-instructions-manual_2967568007.webp)
V 11/21
30
Before starting the appliance, press "PUSH" on the air delivery flap to manually open the flaps. To optimize the
air flow, it is advisable to keep the air delivery flaps completely open during operation.
PRE-OPERATING CHECKS AND OPERATIONS
The following space must be maintained to ensure the operating efficiency of the portable air conditioner.
APPLIANCE START-UP
Open the packaging and remove the box from above. Remove the product and the other elements supplied
(illustrated in the box below).
LCD remote control
Type AAA batteries for the
remote control
Round fitting for window (1)
to be positioned between
the end of the tube and the
end fitting for the window
(in the packing it’s the
same fitting installed on
porthole kit (A)
End fitting for window,
supplied into two parts to
be joined with 2 flaps that
fit together (2)