background image

OWNER’S MANUAL:  

EZ-

PDU’S

 

14 

© 2021 ArcTiv Technologies, Ltd. 

 

ATEZPDU-MANUAL-01 

 

mSensorStatus 

1.3.6.1.4.1.534.6.6.8.7.1 

the sensor connection status from master unit 

0: No sensor connected   1: Sensor connected

 

s1SensorStatus 

1.3.6.1.4.1.534.6.6.8.7.2 

the sensor connection status from slave unit 1 

0: No sensor connected   1: Sensor connected

 

s2SensorStatus 

1.3.6.1.4.1.534.6.6.8.7.3 

the sensor connection status from slave unit 2 

0: No sensor connected   1: Sensor connected

 

s3SensorStatus 

1.3.6.1.4.1.534.6.6.8.7.4 

the sensor connection status from slave unit 3 

0: No sensor connected   1: Sensor connected

 

s4SensorStatus 

1.3.6.1.4.1.534.6.6.8.7.5 

the sensor connection status from slave unit 4 

0: No sensor connected   1: Sensor connected

  

mTemperature 

1.3.6.1.4.1.534.6.6.8.7.6 

 the temperature of master unit 

s1Temperature 

1.3.6.1.4.1.534.6.6.8.7.7 

 the temperature of slave unit 1 

s2Temperature 

1.3.6.1.4.1.534.6.6.8.7.8 

 the temperature of slave unit 2 

s3Temperature 

1.3.6.1.4.1.534.6.6.8.7.9 

 the temperature of slave unit 3 

s4Temperature 

1.3.6.1.4.1.534.6.6.8.7.10 

 the temperature of slave unit 4 

mHumidity 

1.3.6.1.4.1.534.6.6.8.7.11 

 the humidity of master unit 

s1Humidity 

1.3.6.1.4.1.534.6.6.8.7.12 

 the humidity of slave unit 1 

s2Humidity 

1.3.6.1.4.1.534.6.6.8.7.13 

 the humidity of slave unit 2 

s3Humidity 

1.3.6.1.4.1.534.6.6.8.7.14 

 the humidity of slave unit 3 

s4Humidity 

1.3.6.1.4.1.534.6.6.8.7.15 

 the humidity of slave unit 4 

mVolAlarmA 

1.3.6.1.4.1.534.6.6.8.8.1 

the voltage alarm of phase 1 from master unit 

1: Normal  2

Low-voltage   3: Over-voltage 

s1VolAlarmA 

1.3.6.1.4.1.534.6.6.8.8.2 

the voltage alarm of phase 1 from slave unit 1 

1: Normal  2

Low-voltage   3: Over-voltage 

s2VolAlarmA 

1.3.6.1.4.1.534.6.6.8.8.3 

the voltage alarm of phase 1 from slave unit 2 

1: Normal  2

Low-voltage   3: Over-voltage 

s3VolAlarmA 

1.3.6.1.4.1.534.6.6.8.8.4 

the voltage alarm of phase 1 from slave unit 3 

1: Normal  2

Low-voltage   3: Over-voltage 

s4VolAlarmA 

1.3.6.1.4.1.534.6.6.8.8.5 

the voltage alarm of phase 1 from slave unit 4 

1: Normal  2

Low-voltage   3: Over-voltage 

mVolAlarmB 

1.3.6.1.4.1.534.6.6.8.8.6 

the voltage alarm of phase 2 from master unit 

1: Normal  2

Low-voltage   3: Over-voltage 

s1VolAlarmB 

1.3.6.1.4.1.534.6.6.8.8.7 

the voltage alarm of phase 2 from slave unit 1 

1: Normal  2

Low-voltage   3: Over-voltage 

s2VolAlarmB 

1.3.6.1.4.1.534.6.6.8.8.8 

the voltage alarm of phase 2 from slave unit 2 

1: Normal  2

Low-voltage   3: Over-voltage 

s3VolAlarmB 

1.3.6.1.4.1.534.6.6.8.8.9 

the voltage alarm of phase 2 from slave unit 3 

1: Normal  2

Low-voltage   3: Over-voltage 

s4VolAlarmB 

1.3.6.1.4.1.534.6.6.8.8.10 

the voltage alarm of phase 2 from slave unit 4 

1: Normal  2

Low-voltage   3: Over-voltage 

mVolAlarmC 

1.3.6.1.4.1.534.6.6.8.8.11 

the voltage alarm of phase 3 from master unit 

1: Normal  2

Low-voltage   3: Over-voltage 

s1VolAlarmC 

1.3.6.1.4.1.534.6.6.8.8.12 

the voltage alarm of phase 3 from slave unit 1 

1: Normal  2

Low-voltage   3: Over-voltage 

s2VolAlarmC 

1.3.6.1.4.1.534.6.6.8.8.13 

the voltage alarm of phase 3 from slave unit 2 

1: Normal  2

Low-voltage   3: Over-voltage 

Summary of Contents for EZ-PDU's

Page 1: ...OWNER S MANUAL EZ PDU S 1 2021 ArcTiv Technologies Ltd ATEZPDU MANUAL 01 OWNER S MANUAL EZ PDU s EZ PDU s...

Page 2: ...OF CONTENTS 1 PRODUCT OVERVIEW 3 2 SAFETY INSTRUCTIONS 4 3 NETWORK METERING 5 3 1 NETWORK METER FUNCTIONS 5 3 2 INITIALIZATION 6 3 3 HARDWARE SETTINGS 6 3 4 DAISY CHAIN SETTINGS 7 3 5 SOFTWARE OVERVI...

Page 3: ...ld upgradable network module Benefits include Power Monitoring Energy and power monitoring with 1 accuracy Alarms User defined thresholds automate actions before overload Remote Monitoring Securely ac...

Page 4: ...lied brackets for mounting For PDU s with surge protection modules check the following 3 indicators Red Light Absence of earth wire of the power supply Yellow Light Live wire L and Neutral Wire N are...

Page 5: ...ion port SER Daisy chain port RS 485 daisy chain communication port LINK Daisy chain port RS 485 daisy chain communication port MENU Menu key To view the LCD displayed information light up the LCD bac...

Page 6: ...Current Threshold N A 8 N A L2 Voltage and Current Threshold N A 9 N A L3 Voltage and Current Threshold N A 10 N A Temp Humid Threshold N A 3 3 HARDWARE SETTINGS Setting Action Address Code To locate...

Page 7: ...the HUB and connect the Net port from HUB to the internet There are no PDU quantity limits Connect the Master net port with the computer net port then access via IE 3 5 SOFTWARE OVERVIEW User can acce...

Page 8: ...Z PDU Select drop down list view the power date of the Master unit or Slave units Select drop down list to view the power date of L1 L2 or L3 Three phase models only Threshold Setting Set the threshol...

Page 9: ...e Name Fill the device name Web server port Work model Revise master and slave mode to set slave1 2 Virtual Value 1 4 Energy Setting Clear energy line1 Click button The same operation for Line 2 and L...

Page 10: ...estart section for instructions SNMP Telnet The default Get community and Set community is public and private User can modify according to the specific application Fill in the trap address of SNMP man...

Page 11: ...esting and fill in the testing email address If the test email is received the setting is effective See below interface Restart Select Activity User can restart the software or restore to factory defa...

Page 12: ...ageB 1 3 6 1 4 1 534 6 6 8 2 12 the voltage of phase 2 from slave unit 1 s2VoltageB 1 3 6 1 4 1 534 6 6 8 2 13 the voltage of phase 2 from slave unit 2 s3VoltageB 1 3 6 1 4 1 534 6 6 8 2 14 the voltag...

Page 13: ...se 2 from master unit s1AppPowerB 1 3 6 1 4 1 534 6 6 8 5 7 the apparent power of phase 2 from slave unit 1 s2AppPowerB 1 3 6 1 4 1 534 6 6 8 5 8 the apparent power of phase 2 from slave unit 2 s3AppP...

Page 14: ...nit 4 mVolAlarmA 1 3 6 1 4 1 534 6 6 8 8 1 the voltage alarm of phase 1 from master unit 1 Normal 2 Low voltage 3 Over voltage s1VolAlarmA 1 3 6 1 4 1 534 6 6 8 8 2 the voltage alarm of phase 1 from s...

Page 15: ...ent alarm of phase 2 from slave unit 3 1 Normal 2 Low current 3 Over load s4CurAlarmB 1 3 6 1 4 1 534 6 6 8 9 10 the current alarm of phase 2 from slave unit 4 1 Normal 2 Low current 3 Over load mCurA...

Page 16: ...Over Max humidity 3 7 TELNET ACCESS The application of Telnet enables the user to remotely manage the EZ PDU The user can monitor and manage the device by entry the command line from the Telnet progra...

Page 17: ...CD Display direction Vertical Current Accuracy 1 2 byte Resolution 100mA Respond time 400ms Display method LCD Display direction Vertical kWh Accuracy 1 Resolution 0 1kWh Respond time 400ms Display me...

Page 18: ...USE OR NEGLECT OR OPERATION OUTSIDE THE ALLOWED ENVIRONMENT SELLER MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY EXPRESSLY SET FORTH HEREIN WARNING The individual user should take care to determ...

Reviews: