background image

11

16 "

7 34 "

8"

12 58 "

1.

• Wings run behind Gypsum Board.

• Suspend with 1/4-20 Threaded Rod and 

nuts in rear holes.

• Connect to Framing.

2.

• Run Electrical Conduit to fi xture 

through 1/2” Knockout

• Remove Access Cover

• Make electrical connections, reattach 

access cover.

Finial Nut

3.

Threaded Rod

Electrical Conduit

Framing

Ceiling 

(installed after fi xture)

“Wings”

Access Cover

• Connect sections if necessary.

• Use 8-32 Fasteners

8 78 "

Gypsum Board Ceilings

T-Bar Ceilings

• Parrallel T-Bar should be spaced 8-7/8”.

• T-Bar Brackets center & support fi xture on T-Bar.

• Tie off Hanger Wire to Wire Hanger Brackets. 

T-Bar Brackets

Wire Hanger Brackets

LIGHTPLANE 11 RECESSED 

Install Instructions

Tel: (510) 732-1794 Fax: (650) 249-0412 web: www.archltgworks.com

Reviews: