![Arboria VISTA ARBOR Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/arboria/vista-arbor/vista-arbor_assembly-instructions_2963171003.webp)
Product ID 820.1325 / Instruction ID 445.35.14
Page 3 of 4
Updated 11/15/12
Arboria is a division of LWO Corp. / PO Box 17125 / Portland, OR / Cust. Serv. 800-459-8718 / Fax 503-286-4092 / www.arboria.com
VISTA ARBOR
ASSEMBLY INSTRUCTIONS
GARDEN STRUCTURES
Position second side panel under canopy. When flush and aligned
with pencil mark fasten every other slat.
A
A
A
A
Cautiously raise the arbor to a standing position.
Your arbor is now assembled. Follow directions on next page to anchor your arbor.
STEP 4
STEP 3
Align second canopy with pencil marks on gable ends and fasten remaining . screws
through every other slat into each gable.
A
STEP 5
Pencil marks
Pencil marks