AquaScape AquaBasin Small Step By Step Installation Instructions Download Page 2

2

Small
AquaBasin

Instructions

1)  Set the AquaBasin

 in the desired location and 

trace out the area that will be excavated. 

(Fig. 1)

2)  Using the marked area as your guide, dig your 

hole for the AquaBasin

 approximately 1” deeper 

than the basin. Make sure to tamp the base of the 
excavated hole to prevent any unnecessary settling 
that may occur. 

(Fig. 2 & 3)

3)  Place the AquaBasin

 in the hole and use a level  

to make sure that it is level side-to-side and  
front-to-back. 

(Fig. 4)

4)  Once the AquaBasin

 is level, start to backfill  

with dirt. 

(Fig. 5)

*Large AquaBasin

 is shown

Installation Instructions

Fig. 1

Fig. 2

Fig. 4

Fig. 5

Fig. 3

Reviews: