background image

8 — SANITIZE, TEST & PURGE

Sanitize

 

Note: Sanitization is recommended immediately after RO Filter System installation and any inner-part 

servicing. The person sanitizing should have clean hands during this process.

1

  Shut off water supply to RO system.

  Open faucet. If tank is not empty, allow to 

drain until empty.

  With included eyedropper and household 

bleach (5.25%), disconnect white tubing 
from the manifold outlet labeled “TANK”.  

Note: Bleach needs to be handled 
according to manufacturer’s instructions.

  Add 3ml bleach into open end of tank white 

tubing.

  Reconnect the tank from the tube into the 

manifold outlet labeled “TANK”. Be sure to 
push tubing in all the way.

  Sanitation will be completed during the following pressure test and purge. Important: 

Bleach must be completely removed from system before drinking water. See Purge 
instructions below.

Pressure Test

 

Important: Complete sanitization prior to pressure test.

  Open cold water supply valve to RO Filter System.

  To purge air from the plumbing system, open kitchen faucet. Close faucet when water runs 

smooth.

  Confirm RO faucet is closed.

4

  Within approximately 2 hours, pressure will start to build in the RO Filter System. Carefully 

inspect all connections and fittings while this pressure buildup occurs.

  Check for leaks. If leaks are found, fix by ensuring all tubing is cut squarely and fully inserted. 

Also confirm there are no scratches, dents or notches at tubing end. If there are, squarely cut 
1" off and re-insert. 
 

Note: When RO Filter System is first pressurized, water may project  

from faucet air gap hole until air is passed from RO Filter System.

Purge

1

  Open RO faucet and let water flow through system for 24 hours. 

Note: Flow rate will be slow during this time.

2

  Close RO faucet after purge is complete.  

Note: Your RO Filter System is ready for use when purge is complete, however, you will not have filtered 
water immediately. It takes 1-3 hours to completely fill the tank. The flow rate will be less than your 
kitchen faucet. Water will run to the drain while the RO Filter System is filtering water – even when not in 
use. This is normal. Water going to drain will stop automatically when tank is at capacity.

7 — STEP 1–3 FILTER INSTALLATION

 

Before you begin: make sure the cold water valve is shut off and there is no pressure in the system. Carbon 

(red) and Claryum (yellow) filter cartridges will come pre-installed in their cartridge sumps.

1

  Attach red carbon sump to the 1st stage position on the inlet side of the system manifold. 

Make sure all connection points are aligned and push the top of the sump up and into the 
system manifold. Turn it towards the right until it locks in. 

2

   Repeat step 1 for the 2nd Stage RO membrane that goes in the center, and for the yellow 

Claryum cartridge in the 3rd stage position on the outlet side of the system manifold.

  Be sure to turn 2nd stage RO membrane all the way to the right, until drain port on cartridge is 

facing the rear of the system.

OptimH2O™

Stage 2

RO Membrane

AQ-RO3-RO

OptimH2O™

OptimH2O™

Remineralizer

AQ-RO3-RM

1

1

2

3

3

2

1

3

3

2

1

A

B

C

D

2

1

2

1

2

1

1

2

Summary of Contents for OptimH2O AQ-RO-3

Page 1: ...ter technology is working for you System tested and certified by NSF International against NSF ANSI Standard 42 53 401 and conforms to NSF protocol P473 for reduction of claims specified on the Perfor...

Page 2: ...aucet hole to ensure there will be enough 3 8 tubing available for both connections Wait to cut tubing and follow instructions below 4 Remove system remineralizer and tank from under your sink to begi...

Page 3: ...RO3 RO OptimH2O OptimH2O A B C D E F OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O A B C 2 1 2 INSTALL SYSTEM MANIFOLD 1 Select an easily accessible area under the sink to mount syste...

Page 4: ...cet 5 INSTALL RO DRAIN CONNECTOR WARNING CAUTION Be sure that all electrical appliances and outlets are turned off at the circuit breaker before working in the cabinet area Please wear safety glasses...

Page 5: ...Membrane red tubing from faucet 1 Insert restrictor into the end of the red tubing 2 Attach red tubing to the 90 elbow until it stops 3 Attach 90 elbow to the membrane drain port VI Faucet to Drain C...

Page 6: ...ing end If there are squarely cut 1 off and re insert Note When RO Filter System is first pressurized water may project from faucet air gap hole until air is passed from RO Filter System Purge 1 Open...

Page 7: ...the scaling and fouling tendencies of the Feed Water 2 Measured at 50 psi 77 2 F and 717 mg l TDS per NSF ANSI Standard 58 3 Efficiency rating means the percentage of the influent water to the system...

Page 8: ...y filled flush saturate the remineralizer cartridge by opening up the filter faucet and allowing the purified water to run through the remineralizer for 3 minutes The water may come out cloudy during...

Page 9: ...oroethylene 0 007 0 083 0 001 99 cis 1 2 dichloroethylene 0 07 0 170 0 0005 99 trans 1 2 dichloroethylene 0 1 0 086 0 001 99 1 2 dichloropropane 0 005 0 080 0 001 99 cis 1 3 dichloropropylene 0 079 0...

Page 10: ...hibit the exclusion or limit of incidental or consequential damages so the above limitation or exclusion may not apply to you WARRANTY CARD Warranty registration is not required for coverage under the...

Page 11: ...s to NSF protocol P473 for reduction of claims specified on the Performance Data Sheet and at nsf org The AQ RO 3 system has been tested and certified by NSF International against NSF ANSI Standard 58...

Reviews: