background image

www.aquasafecanada.com   |   Home II + Remineralization Installation Instructions 08/13   |   page 11

Screw the tank top valve found in your Small Parts Bag onto the threads 
found on top of the R.O Water Holding Tank (Fig. 18).   Remember to ap-

ply 4-7 wraps of Teflon tape to the thread of the tank itself.

PLEASE NOTE: The long length of blue tubing used to flush your pre-
filters is the tubing you will use to hook up both the water storage tank 
as well as the dedicated Reverse Osmosis faucet that came with your 
system.

You will need to cut this length of blue tubing in two pieces accordingly.  
The length of tubing used to hook up your kitchen faucet (which will be 
attached to the left side of the Final Polishing Filter) will probably need to 
be longer than the length of blue tubing used to hook up your R.O Water 
Holding tank (which will be attached to the right side of the Polishing 
Filter). Take a moment and judge how much tubing you will need for 
each purpose based upon where the final placement of your system will 

be located under your sink (or the like) 
and then cut the blue tubing to length 
with a sharp knife making sure your cut 
is straight (not at an angle).

Now insert one end of the cut length of 
blue tubing (for the tank) into the male 
“T” adaptor found on the right side of 
the Final Polishing Filter and the other 
end into the tank top valve connecting 
the holding tank to the system (Fig. 19).

11.0  Clear the Decks

If you have not already done so, the next step is to totally clean out under your sink. Get some rags to 
wipe up any water drips that may be present from the installation process. Now, step back and look at 
where you want the unit and the tank positioned. Please remember, you have to service the system so 
consider accessibility.

12.0  Preparing the Discharge Water Saddle Clamp

Find a location on the drain pipe under your sink where you wish to secure the discharge water saddle 
clamp found in your Large Parts Bag (Fig. 20). Make sure—MAKE REALLY SURE — that the location you 
have chosen is above the trap! (The trap is the “U” shaped part of the drain pipe) You may secure the 
saddle clamp on a horizontal pipe JUST AS LONG AS YOU ARE ABOVE THE TRAP!!! Also try to secure 
the saddle clamp where it will not block anything, like where you want to put your system or the R.O. 
Water Holding Tank.

Drill out your chosen spot with a 1/4 inch drill bit.  The 1/4 inch hole that you drill into the carefully 
chosen location on your drain pipe is where the yellow discharge line will be inserted into and secured 
into place with the discharge water line (Drain) Saddle Clamp.

Connect the Polishing Filter to the tank top valve

using a length of blue tubing cut to fit your setup

PURE

PRO

Reminer

alization

www.aquasafecanada.com

Final Polishing Filter

Figure 19

Attach the tank 

top valve to the 

Final Polishing 

Filter

Stand the unit inside a drip pan. Disposable aluminum baking sheets work fine. We suggest this 

because you may have water drips while servicing the system or when you change out filters.

TIP

Figure 18

Attach the tank 

top valve to the 

R.O. Water  

Holding Tank

Summary of Contents for Home II COMBO

Page 1: ...ss than 50psi we highly recommend a fully automatic booster pump which is found on our websites general parts and accessories page We also highly recommend a booster pump if your water is extremely turbid with ppm counts beyond 600ppm The installation instructions that follow are extremely detailed if a leak is experienced during installation please see the Leak Prevention Section on page 16 ATTEN...

Page 2: ...ddle Clamp 11 13 0 Installing the Faucet 12 14 0 Extra information for the Home II Remineralization COMBO 14 14 1 Where do I install the PSI Meter from my COMBO System 14 14 2 How do I use the TDS Meter from my COMBO System 15 14 3 How do I store my extra case of 27 6 changes pre filters post filters and remineralization cartridges 15 Leak Prevention Page 16 Threaded Fittings 16 Pre Filter Caniste...

Page 3: ...brane Housing Aqua safe exclusive E Z Flush Flow Restrictor Back View 5th Stage Final Polishing Filter for taste to faucet icemaker etc of membrane houseing to tank Pure water out PUREPRO Remineralization Final Polishing Filter Remineralization Cartridge for alkaline re mineralized water Simply follow the step by step instructions below Please do not make the mistake of skipping a step FOR REFEREN...

Page 4: ... and the CCB coconut carbon block filter is stage three See pictures below of the three prefilters The GAC is the only one of the three prefilters that only goes in one way The GAC must be placed with the gasket up and the plastic mesh down With the prefilters inside each prefilter canister carefully screw the canisters into place Try to keep the prefilters centered as much as possible during this...

Page 5: ...of the elbow adaptors from the Small Parts Bag screw one of them into the INLET left side of the three pre filters Fig 5 and the other into the OUTLET right side of the three pre filters Fig 5 S Please note Apply 4 7 wraps of Teflon tape found in the Large Parts Bag on each of the elbow adaptors throughout this installation to prevent any possible leaks 5 0 Preparing the Feed Water to your system ...

Page 6: ...sing the needle piercing saddle clamp which can be found in your Large Parts Bag Fig 7 You will need a Phillips screwdriver and small pair or pliers for this step Be sure to install above your sink s shut off valve DO NOT ATTACH TO THE HOT WATER PIPE AS HOT WATER WILL DAMAGE THE FILTERS WITHIN YOUR SYSTEM DO NOT PIERCE THE COLD WATER LINE AT THIS STAGE 5 3 Connecting the feed water line to your sy...

Page 7: ...ed tubing supplying your system with its feed water PLEASE NOTE Do not turn your home s emergency cold water shut off back to its ON position yet 5 5 Flushing of the Pre filters Found in your Large Parts Bag is a coiled length of blue tubing Uncoil the tubing and insert one end into the OUTPUT elbow right side of the three pre filters and place the other end of the blue tubing into your kitchen si...

Page 8: ...l out the tubing Please note In the future be sure to de pressurize your system before removing tubing from any fitting on your system To de pressurize your system you simply need to turn the manual shut off valve found on the feed water line to its 90 degree OFF position then turn your tank top valve found on top of the water holding tank to the 90 degree OFF position and then press down on your ...

Page 9: ...s the purified water produced by the R O Membrane and is referred to as PERMEATE water Now turn the dial on top of the E Z Flush Flow Restrictor clockwise Right entirely closing the valve of the E Z Flush Flow Restrictor and then turn the Manual Shut Off Valve Fig 12 found on the feed water supply line of your system to its ON Position Within a moment PERMEATE water will begin to flow out of the s...

Page 10: ...LOW For your convenience this system is fully automatic When you draw water from the Aquasafe faucet the system will auto fill its holding tank and then shut off until more water is drawn from the sys tem where the cycle would then repeat This means that you will always have an abundance of pure healthy water on tap at any given time you desire Figure 13 Timing flow rates to set up the E Z Flush F...

Page 11: ... way ASV Automatic Shut Off Valve and push it into the elbow adaptor on the left side of the Remineralization Cartridge step 2 Fig 15 The Remineralization Cartridge makes pH balanced alkaline water and releases a perfect balance of minerals in the form of calcium magnesium sodium and potassium ions that can be 100 absorbed by the human body Because of this the ppm of the water dispensed at your Aq...

Page 12: ...her than that coming out of the R O Membrane 10 0 Prepare the R O Water Holding Tank The R O Water Holding Tank has an air bladder and a water bladder inside it The air bladder comes pre set from the factory at 7 PSI for your convenience CAUTION Changes to the PSI of the air bladder inside the R O Water Holding tank may cause harmful back pressure which can result in the Auto Shut Off Valve ASV ma...

Page 13: ... already done so the next step is to totally clean out under your sink Get some rags to wipe up any water drips that may be present from the installation process Now step back and look at where you want the unit and the tank positioned Please remember you have to service the system so consider accessibility 12 0 Preparing the Discharge Water Saddle Clamp Find a location on the drain pipe under you...

Page 14: ...lation Either find another spot like beside the sink or get a Pro a Laminate the most common material is a laminated counter top Choose the most appropriate spot on top then crawl under and see where it clears Remember you have a large plastic washer to put under the counter The safe thing to do is to drill a pilot hole with your smallest bit first Then drill a inch hole and assemble the faucet re...

Page 15: ...lass installers have diamond drills and all vendors of stone have them Some will rent it out as will Rent All stores Start the hole by drilling a hole in a piece of scrap wood This will serve as a guide Hold the piece of wood and let the diamond drill bit do the work DO NOT push down or apply pressure Keep the hole filled with water and wipe out the hole often It is important to let the weight of ...

Page 16: ...COMPLETED TO SPOT ANY POTENTIAL LEAKS Congratulations on completing the installation process You may now start drinking the ultra puri fied drinking water you desire for the health and enjoyment of you and your loved ones If you require further clarification after going through all of the information of these instructions please feel free to email Aquasafe for further support at techsupport aquasa...

Page 17: ...The TDS Total Dissolved Solids Meter of your system is ex tremely easy and intuitive to use and comes with its own set of intructions but here is a quick tutorial First you will need to get a small glass and rinse it of all dust or other particles Now fill the rinsed glass with the water for which you would like to deter mine the TDS Reading Total Dissolved Solids Remove the cap from the bottom of...

Page 18: ...is needed grab the tubing 3 4 inch from where the tube inserts into the threaded fitting in order to not scratch the section of tube that will be inserting further into the threaded fitting A scratched section of tubing that is inserted into a threaded fitting can act as a path for water to flow which in turn may result in a small leak Pre Filter Canister Housing All Aquasafe Reverse Osmosis Pre F...

Page 19: ... each day for all its drinking and cooking purposes A 3 gallon per day consumption rate over a year s time is equal to roughly 1095 Gallons which therefore calls for a Reverse Osmosis Membrane change approxi mately once every 3 5 years A 5 Gallons per day consumption rate over a years time is equal to roughly 1825 Gallons which therefore calls for Reverse Osmosis change approximately once every 2 ...

Page 20: ... the ultra purified healthy water you desire 1 2 3 Turn the tank top valve found on top of your water holding tank to its OFF position feed water line Manual Shut Off Valve in OFF position Press down on your kitchen faucet until the flow of water stops to complete the depressurizing process Tank Top Valve in OFF position ON OFF Manual Shut Off Valve top view TOP VIEW OF SYSTEM Shut off the flow of...

Page 21: ...hite gasket at the top and mesh on the bottom Replace the second GAC Granular Activated Carbon and third CCB Coconut Carbon Block pre filters in the same way The only filter for which direction matters is the GAC filter Move on to the pre filter flush Figure 27 Changing the pre filters Remineralization Step When should I change the Remineralization Cartridge The Remineralization Cartridge should b...

Page 22: ...e saddle clamp feed water in PUREPRO Remineralization Manual Shut Off Valve in OFF position feed water in PUREPRO Remineralization to tank to faucet NOTE Back View hanging bracket not shown for clarity 1 2 3 Disconnect see Fig 10 the white tubing from the third pre filter housing and the yellow tubing from the output side of the E Z Flush Flow Restrictor Connect the yellow tubing to the last pre f...

Page 23: ...Schedule starting on page 17 1 2 Removing The Old Membrane You will now be able to see the Reverse Osmosis Membrane inside the R O Membrane Housing The membrane can swell inside its housing making it difficult to remove by hand Use a pair of needle nose pliers or the like to grab hold of the 1 inch white cylinder protruding from the base of the membrane and pull out the old R O Membrane RO MEMBRAN...

Page 24: ... reversing steps 3 and 2 Make sure the arrow on the Remineralization Cartridge is pointing in the direction of water flow when you hook it back up 1 Depressurize your system see Fig 25 Pull the Remineralization Cartridge out of its clips 3 4 5 6 New Cartridge Old Cartridge 2 Turn on the Manual Shut Off Valve and Tank Top Valve to repressurize your system PLEASE NOTE Please flush out the Reminerali...

Page 25: ...uasafe Systems we greatly value your business to tank to faucet PUREPRO Remineralization www aquasafecanada com Final Polishing Filter Final Polishing Filter Remove see Fig 10 the two tubes from the fittings on either side of your used Final Polishing Filter Attach the new Final Polishing Filter by reversing steps 3 and 2 The male T adaptor connects to the remineralization cartridge 1 Depressurize...

Page 26: ...se Osmosis Systems are designed as DIY Do It Yourself therefore there should not be any costs associated with removal or installation of this very simple to install system This warranty does not apply to mechanical or structural damage caused by excessive water pressures over 150 psi improper han dling installation or abuse Faucets and water filtration valves are warranted for a period of one year...

Reviews: