Quartz Thermo
installation guide
page 5
Step-by-step instructions
In addition to the guide below it is essential that the written instructions
overleaf are read and understood and that you have all the necessary
components (shown overleaf) before commencing installation. Failure to
install the product in accordance with these instructions may adversely affect
the warranty terms and conditions. Do not undertake any part of this
installation unless you are competent to do so. Prior to starting ensure that
you are familiar with the necessary plumbing regulations required to install
the product correctly and safely.
Quartz Thermo is supplied with universal fixings.
!
1
Mark the position for the four fixing points as outlined above.
2
Carefully remove the valve from its packaging and retain the mortar guard
for later use.
3
Remove the on/off lever assembly, if fitted,
from the valve by carefully pulling the
assembly away from the valve (a screw is
provided in the screwpack to secure the
on/off lever assembly to the valve towards
the end of installation).
4
65mm
150mm
Supply pipes hot on
left, cold on right
65mm
60mm
min. from
back face
of valve to
finished/
tiled wall
surface
(10mm
allowance
for tiles)
!
If installing the product built in to a solid wall, chase out a suitable recess in
the wall to receive the valve and pipe work. If installing the valve in a
concealed panel mounted situation, in most cases it will be necessary to first
install a suitable sound fixing in the cavity area before fixing the valve.
A hole of ø130mm is required to install the valve and gain access to inlet and
outlet connectors.
The valve needs to be mounted to the depth shown at the following centres.
The distance between the 15mm inlet centre pipe centres is 150mm as shown.
100mm max.
to finished/
tiled wall
surface
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818