10
1) The frame must be fixed by bolts (M10) to concrete foundation or brackets. The concrete foundation
must be solid and fastened; the bracket must be strong enough and antirust treated;
2)
Please don’t stack substances that will block air flow near inlet or outlet area, and there is no barrier
within 50cm behind the main machine, or the efficiency of the heat pump will be reduced or even
stopped;
3) The machine needs an appended pump (Supplied by the user). The recommended pump
specification-
flux: refer to Technical Parameter, Max. lift ≥10m;
4) When the machine is running, there will be condensation water discharged from the bottom, please
pay attention to it. Please hold the drainage nozzle (accessory) into the hole and clip it well, and then
connect a pipe to drain the condensation water out.
2. Wiring
a. Connect to appropriate power supply, the voltage should comply with the rated voltage of the
products.
b. Earth the machine well.
c. Wiring must be handled by a professional technician according to the circuit diagram.
d. Set leakage protector according to the local code for wiring (leakage o
perating current ≤ 30mA).
e. The layout of power cable and signal cable should be orderly and not affecting each other.
3. Electric wiring diagram
a. For power supply: 230V 50Hz
b. For power supply: 400V 50Hz
Note:
1)
Must be hard wired, plug is not allowed.
2) The swimming pool heat pump must be earthed well.
Distribution Box (Customer prepare)
Earthing
Power Supply
230V 50Hz
Breaker
Fuse
Power Cord
Swimming Pool Heat Pump Wiring Board
Distribution Box (Customer prepare)
Power Supply
400V 50Hz
Earthing
Breaker
Fuse
Power Cord
Swimming Pool Heat Pump Wiring Board
Summary of Contents for AS110
Page 1: ...aquaheat INVERTER POOL HEAT PUMP USER MANUAL ...
Page 2: ......
Page 24: ...21 J Wi Fi Operation ...
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ...AQ00ASC R32 P5 ...