background image

 

 

2

 

DUNOS 

/

 

DUNOS 

RW

 Operating Manual

 

AquaDuna GmbH & Co KG / Ferdinand-von-Steinbeis-Ring 31 / 75447 Sternenfels / Germany 

Telephone: +49 (0)7045 204980 / 

www.aquaduna.com

Subject to technical modifications. 

© Copyright by AquaDuna GmbH & Co. KG (2019) All rights reserved. Contact: www.aquaduna.com 

 

 

 

Contents 

1.

 

GENERAL ........................................................................................................ 4

 

1.1.

 

Information about this manual 

4

 

1.2.

 

Symbols used 

4

 

1.3.

 

Limitation of liability 

5

 

1.4.

 

Copyright 

5

 

1.5.

 

Warranty 

5

 

2.

 

SAFETY ........................................................................................................... 6

 

2.1.

 

Proper use 

6

 

2.2.

 

Operating conditions 

6

 

2.3.

 

Staff qualifications 

7

 

2.4.

 

Duties of the operator 

7

 

3.

 

TECHNICAL DATA .......................................................................................... 8

 

3.1.

 

Function 

8

 

3.2.

 

General operating values 

8

 

3.3.

 

Material 

8

 

3.4.

 

Structure of DUNOS 

R

 

8

 

3.5.

 

Measurements DUNOS R 

9

 

3.6.

 

Structure of DUNOS RW 

9

 

3.7.

 

Measurements DUNOS RW 

9

 

3.8.

 

Arrangement of the slotted nozzles 

10

 

3.9.

 

Special versions 

10

 

4.

 

INSTALLATION AND COMMISSIONING ..................................................... 11

 

4.1.

 

Mounting 

11

 

4.2.

 

Commissioning 

12

 

5.

 

OPERATION .................................................................................................. 12

 

6.

 

MAINTENANCE ............................................................................................. 12

 

Summary of Contents for DUNOS R

Page 1: ...Assembly Manual DUNOS R DUNOS RW...

Page 2: ...ls used 4 1 3 Limitation of liability 5 1 4 Copyright 5 1 5 Warranty 5 2 SAFETY 6 2 1 Proper use 6 2 2 Operating conditions 6 2 3 Staff qualifications 7 2 4 Duties of the operator 7 3 TECHNICAL DATA 8...

Page 3: ...ject to technical modifications Copyright by AquaDuna GmbH Co KG 2019 All rights reserved Contact www aquaduna com 7 INTEGRATION AND ACTIVATION 13 7 1 Integration into a cleaning facility 13 7 2 Activ...

Page 4: ...ation and maintenance of the appliance The basis of working in safety is the observance of all safety notices provided The manual is an essential part of the product and must be kept freely available...

Page 5: ...by the operator which have not been discussed with and authorised by the manufacturer Furthermore the general terms and conditions also apply 1 4 Copyright Copyright applies to this manual Copyright...

Page 6: ...proper use of the rotation cleaner the observance of the fol lowing conditions is essential with non observance carrying the threat of severe injury The rotation cleaners may only be operated in close...

Page 7: ...handling rotating and spraying devices must have been instructed on the hazards connected with these appliances Persons who are not registered as operating staff should not linger within the operatin...

Page 8: ...t wear free during operation The cascades emerging from the slotted nozzles extensively strike the wall of the container The thereby emerging washing down forces remove deposits from the container wal...

Page 9: ...urements DUNOS R DUNOS R15 R32 R60 R90 Installation diameter min DN 20 DN 40 DN 65 DN 100 Media connection thread IG 1 8 IG 3 8 IG 3 4 1 IG 2 Media connection splint 10 13 18 25 4 29 41 52 Working pre...

Page 10: ...arrangement of the slotted nozzles the following spraying angles may be achieved 360 270 upper 180 lower 270 upper 180 upper At the customer s request variations to spraying angles may be made 3 9 Spe...

Page 11: ...4 Installation and commissioning 4 1 Mounting After unpacking the rotation cleaner the cleaner should then be checked over for outer damage If no support tube lance is supplied fully assembled the cl...

Page 12: ...ota tion cleaner is ventilated For hand guided fittings these are not to be opened abruptly in order to avoid pres sure shocks 5 Operation For operation in automatically cleaning facilities operators...

Page 13: ...of the facility are familiar with the facility s design It is vital that training in emergency shutdown be given and the necessary elements for emer gency shutdown be known The training of those entru...

Page 14: ...oducts undergo a final functional test 100 check We thereby ensure that only reliable products are allowed to leave our premises 11 Disposal All materials stainless steels and PEEK used in production...

Reviews: