background image

How it works

Inside the reactor a UV-C lamp produces radiation with a wavelength of 253.7 nm. Radiation of this type kills bacteria, viruses, algae 
and fungi (e.g. Legionella and Cryptosporidium). The UV-C unit produces clean, fresh, clear water in an efficient, environmentally 
friendly way. The water is fed through the UV-C device by a pump. The UV-C radiation neutralizes bacteria, viruses and other 
micro-organisms and prevents them from reproducing. Floating algae is also destroyed by this radiation, which greatly improves the 
clarity of the water. The UV-C unit is equipped with an electronic ballast. This ballast ensures optimum performance of the lamp. 

In addition, the stainless steel reactor reflects the UV-C radiation, increasing efficiency by up to 35%. 
Thanks to the UV-C unit, the water is disinfected efficiently and safely, providing you 
with excellent water quality. Overdosing with UV-C is not possible.

Installation of earthing (drawing 1)

1.  Before the plastic strain relief (4) is fitted on the earthing bolt (1), first pull the cable (2) through the 

strain relief (4). Place the strain relief (4) about 10 cm from the eye (2) of the earthing cable.

2.  Place the eye (2) of the cable over the earthing bolt that is attached to the housing.
3.  Then place a serrated lock washer (3).
4.  Attach the strain relief (4) to create a Ø5 cm loop.
5.  Finally, place the second serrated lock washer (5) and the lock nut (6) on the earthing bolt.
6.  Once the parts have been placed on the earthing bolt in the correct order, it 

can be tightened with an 8 mm open-end or ring spanner.

Warning:

Always ensure proper earthing. In case of doubt about the earthing or the electrical installation in general, always consult a 
qualified electrician. Incorrect earthing can be dangerous and/or lead to corrosion of stainless steel or aluminium reactors.  

Make sure the reactor is always grounded.

Device installation (figure 2)

Decide where you want to mount the device. The best place to install the UV-C device is directly after 
the filter(s). See the schematic diagram in the operating instructions. Make sure there is always water 
flowing through the device when the lamp is on. Never install the device in direct sunlight.
Install the device in a dry, well-ventilated area. The device can be installed either horizontally or vertically, provided that the water 
flow is from bottom to top (see schematic diagram at the beginning of the instructions for use), with 30 cm of unobstructed space 
on the side opposite the lamp connection for future maintenance. At least one metre of unobstructed space must be left on the 
side with the lamp connection for convenient future replacement of the lamp (K) without having to disconnect the entire device.

CAUTION

: All connections and couplings must be hand-tight. Do not tighten them with tools. Otherwise damage may occur.

Important

 Please read carefully through these instructions 

for use before installing this device.   

AQUAFORTE POWER SIGNAL UV 75W  •  7

EN

PRIME

Summary of Contents for Prime UV 75W

Page 1: ...AQUAFORTE IS A TRADEMARK OF SIBO FLUIDRA NETHERLANDS B V www aqua forte com PRIME Aqua Forte Prime Power Signal UV 75W ...

Page 2: ...Index Power Signal UV 75W EN 7 9 Power Signal UV 75W DE 10 12 Power Signal UV 75W FR 13 15 Power Signal UV 75W NL 16 18 2 AQUAFORTE POWER SIGNAL UV 75W ...

Page 3: ...Drawings 6 1 2 5 4 3 2 1 N K M P I T L J O U AQUAFORTE POWER SIGNAL UV 75W 3 PRIME ...

Page 4: ...3 4 4 AQUAFORTE POWER SIGNAL UV 75W ...

Page 5: ...Possibleinstallationandflowdirection PREFILTER PUMP AERATED BOTTOM DRAIN FILTER HEATER POWERSIGNALUV75W POND AQUAFORTE POWER SIGNAL UV 75W 5 PRIME ...

Page 6: ...0 50 Housing Inox 304 Shape Z U Electronic ballast 230V AC 50 60Hz Maximum current 0 57A Lamp wattage 75W Lamp technology Low Pressure Mercury lamp Lamp AquaForte T5 75W 4P Lifespan lamp 9 000h Lifespan indicator Yes Replace lamp alert Yes Flow switch No Dimensions A B C D E 70mm 1000mm 63mm 770mm 1000mm C C C D B A E 6 AQUAFORTE POWER SIGNAL UV 75W ...

Page 7: ...nd the lock nut 6 on the earthing bolt 6 Once the parts have been placed on the earthing bolt in the correct order it can be tightened with an 8 mm open end or ring spanner Warning Always ensure proper earthing In case of doubt about the earthing or the electrical installation in general always consult a qualified electrician Incorrect earthing can be dangerous and or lead to corrosion of stainles...

Page 8: ...hourmeter figure4 When the UV C device is switched on the program performs a self diagnostic test The LED flashes red quickly for about one second Then the LED lights green flashes green or lights red This depends on the number of hours that the system has already been in operation When the UV C lamp is switched on for the first time or after the reset function is used the value will be 9 000 The ...

Page 9: ...lation and Disassembly section before installing a new housing or electrical section Make sure you save the various separate parts for the earth connection These are not supplied with a new housing or electrical section If in doubt about the connection consult a qualified installer Guaranteeconditions The product is guaranteed for 24 months from the day of sale against factory production faults Th...

Page 10: ...hnfederring 3 4 Befestigen Sie die Zugentlastung 4 so das eine Schlaufe von Ø 5 cm entsteht 5 Platzieren Sie den letzten und zweiten Zahnfederring 5 und die Kontermutter 6 auf der Erdungsschraube 6 Wenn die Teile in der in der korrekten Reihenfolge auf der Erdungsschraube platziert wurden kann dies mit einem Ringschlüssel Nr 8 festgezogen werden Achtung Sorgen Sie immer für eine ordnungsgemäße Erd...

Page 11: ... das Leuchtmittel brennt kann durch die transparenten Teile des Gehäuses erfolgen 6 Das Gerät schaltet sich ab sobald die Stromspannung vom Gerät getrennt wird Gebrauchsanweisungfürledstundenzähler zeichnung4 Wenn die UVC Einheit eingeschaltet wird läuft zuerst ein Selbsttest Die LED wird ca 1 Sekunde schnell rot blinken Danach wird die LED grün leuchten grün blinken oder rot leuchten Dies ist von...

Page 12: ...e eines neuen Gehäuses oder eine Trafos elektrischen Teils lesen Sie bitte zuerst das Hauptstück Installation und Demontage Achten Sie darauf das alle Kleinteile der Erdung aufgehoben werden Diese werden nicht mit einem Ersatzteil wie Gehäuse oder Trafo zusammen geliefert Bei Zweifeln fragen Sie bitte einen anerkannten Installateur Garantiebedingungen Für das Produkt gilt auf das Kaufdatum folgend...

Page 13: ...une boucle de Ø 5 cm 5 En dernier lieu poser la deuxième bague de retenue dentée 5 et l écrou autobloquant 6 sur le boulon de mise à la terre 6 Lorsque les pièces sont placées dans l ordre correct sur le boulon de mise à la terre elles peuvent être serrées au moyen d une clé à fourche ou polygonale numéro 8 Attention Veillez à toujours avoir une mise à la terre correcte En cas de doute concernant ...

Page 14: ... coupée Moded emploiducompteurhoraireled figure4 Lorsque l appareil UV C est activé le programme procède à une auto vérification La LED va clignoter rapidement à un intervalle d environ 1 seconde Ensuite la LED s allume en vert clignote en vert ou s allume en rouge Cela dépend du nombre d heures de service du système Lorsque la lampe UV C est activée pour la première fois ou après utilisation de l...

Page 15: ...e Installation et Démontage Conservez soigneusement les diverses pièces de la mise à la terre Celles ci ne sont pas livrées avec un corps neuf ou une section électrique neuve En cas de doute concernant le branchement consultez un installateur agréé Conditionsdegarantie Le produit est garanti pendant 24 mois après la date d achat contre les vices de fabrication La lampe le verre de quartz et le sta...

Page 16: ... 3 4 Bevestig de trekontlasting 4 zodat er een lus van Ø 5cm ontstaat 5 Plaats als laatste de tweede tandveerring 5 en de borgmoer 6 op de aardingsbout 6 Als de onderdelen op de juiste volgorde op de aardingsbout zijn geplaatst kan dit met een steek of ringsleutel nummer 8 vastgedraaid worden Letop Zorg altijd voor een correcte aarding Raadpleeg bij twijfel over de aarding of de elektrotechnische ...

Page 17: ... Het apparaat wordt uitgeschakeld wanneer de spanning van het apparaat wordt gehaald Gebruiksaanwijzingledurenteller tekening4 Als het UV C apparaat wordt ingeschakeld gaat het programma zichzelf controleren De LED gaat ongeveer 1 seconde snel rood knipperen Hierna gaat de LED groen branden groen knipperen of rood branden Dit is afhankelijk van het aantal uren dat het systeem al in werking is gewe...

Page 18: ...onteren van een nieuwe behuizing of elektrisch gedeelte gelieve eerst het hoofdstuk Installatie en Demontage te lezen Let erop dat de diverse losse onderdelen van de aarding goed bewaard worden Deze worden niet met een nieuwe behuizing of elektrisch gedeelte meegeleverd Raadpleeg bij eventuele twijfel over de aansluiting een erkende installateur Garantievoorwaarden Het product is gedurende 24 maan...

Page 19: ...AQUAFORTE POWER SIGNAL UV 75W 19 PRIME ...

Page 20: ...Made in the Netherlands 9602055 www aqua forte com AQUAFORTE IS A TRADEMARK OF SIBO FLUIDRA NETHERLANDS B V www aqua forte com PRIME ...

Reviews: