![Applied Biosystems 2720 User Manual Download Page 101](http://html.mh-extra.com/html/applied-biosystems/2720/2720_user-manual_2955102101.webp)
93
Thermal Cycler Temperature Verification System For GeneAmp
®
PCR Systems 2720, 9600, 9700, 9800,
and Veriti
®
System User Guide
Chapter 8
Calibration verification test
Configuring the
GeneAmp
®
9800
“Setting up the 0.1-mL probe assembly” on
.
2. Power on the GeneAmp
®
9800.
For best results, allow the thermal cycler 15 to 30 minutes to warm up to
ambient temperature before performing the test.
3. When the main menu opens, press
Util
to open the Utilities
screen.
4. Press
Diag
to open the Diagnostics screen.
5. Press
F3
(TmpVer) to open the Temperature Verification screen.
6. Press
F1
(Temp). This action opens the Calibration Verification screen and
configures the GeneAmp
®
9800 for the calibration verification test.
below.
Running the test
Use the digital thermometer to take temperature readings of the sample well that is
connected to the 0.1-mL probe assembly. You take a reading at each of two setpoint
temperatures.
Note:
If necessary, press
F5
(Cancel) to exit the test.
To run the calibration verification test:
above.
Temperature Verification
Temp - Calibration Verification
TNU - Temperature Non-Uniformity
F1
F3
F4
F5
F2
Temp
Exit
TNU
Calibration Verification
Block temp = xx.x°C Cover temp = xxx°C
Place probe in well A6
Press Run
F1
F3
F4
F5
F2
Run
Cancel