background image

I

K

PRE-DRILL

PRE-DRILL

PRE-DRILL

7

15

14

d

d

d

d

d

d

d

d

d

d

Position and line up the hasp

and staple with framing on the

inside of the door.

a

d

x 7

Fix the 481mm board to two of the 70mm battens.

These should be flush with the short side and off

set 10mm from the long. Fix the battens in place

using 2 x 25mm screws for each.

Repeat this with the remaining blocks and board.

ah

Take care when

trimming the roof

felt.

17

ah

ah

Place the felt over the roof so that there is

approximately a 45mm overhang on all sides.

Secure the felt to the roof, nailing into the

intervals.

Cut and fold the felt at the corners as shown.

Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury | Worcestershire | DY10 4JB

Issue 0122

J

L

PRE-DRILL

Make sure that the screws are

positioned so that each locates

into the batten.

Reviews: