I
K
PRE-DRILL
PRE-DRILL
PRE-DRILL
7
15
14
d
d
d
d
d
d
d
d
d
d
Position and line up the hasp
and staple with framing on the
inside of the door.
a
d
x 7
Fix the 481mm board to two of the 70mm battens.
These should be flush with the short side and off
set 10mm from the long. Fix the battens in place
using 2 x 25mm screws for each.
Repeat this with the remaining blocks and board.
ah
Take care when
trimming the roof
felt.
17
ah
ah
Place the felt over the roof so that there is
approximately a 45mm overhang on all sides.
Secure the felt to the roof, nailing into the
intervals.
Cut and fold the felt at the corners as shown.
Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury | Worcestershire | DY10 4JB
Issue 0122
J
L
PRE-DRILL
Make sure that the screws are
positioned so that each locates
into the batten.