product specification for the acceptable temperature and
humidity operating ranges.
•
Install the stack in a site free from strong electromagnetic
field generators (such as motors), vibration, dust, and direct
exposure to sunlight.
•
Leave at least 10cm of space at the front and rear of the
switch for ventilation.
•
Install the switch on a sturdy, level surface that can support
its weight, or in an EIA standard-size equipment rack. For
information on rack installation, see the next section, Rack-
Mounting.
•
When installing the hub stack on a level surface, attach the
rubber feet to the bottom of each device. The rubber feet
cushion the hub and protect the hub case from scratching.
Rack Mounting
The switch can be mounted in an EIA standard-size, 19-inch
rack, which can be placed in a wiring closet with other
equipment. Attach the mounting brackets at the switch’ s front
panel (one on each side), and secure them with the provided
screws.