INSTALLATION
STEP 1:
Ensure that the center distance of
outlets are between
5.7" - 6.1"
.
The Hot inlet is on the
Left
,
and t h e
Cold
inlet is on the
Right
.
The height of the inlets from the
fl
oor
is about
35.5" - 39.4
". Ensure each
inlet with the same height.
STEP 2:
a. Wrap the smaller point of
Nipples
[08]
with water sealing tape.
b. Install the
Nipples [08]
and secure
by wrench.
STEP 3:
Turn on the valves an
d fl
ush the hot
and cold supplies thoroughly for 30s
to 1 minute. Then turn o
ff t
he valve
and seal the wall around the nipples
with waterproof sealant.
STEP 4:
Install the
Covers [07]
and place the
leveler on the
Covers [07]
and make
sure the leveler is in level condition.
Then place the leveler on the shanks.
Make sure the leveler is in level
condition and the distance between
the shanks is
5.9"
.
PG. 3
5.7"-6.1"
Hot
Cold
1/2"
35.5"-39.4"
Floor
1
2
a.
b.
[08]
3
4
5.9"
[07]
shank
[150mm]
Summary of Contents for SH-AZ101 Series
Page 1: ...SH AZ101 RAINFALL SHOWER BAR INSTALLATION 808000 792 20220222 05 10 2022 ...
Page 2: ......
Page 3: ...Order or Purchase SKU or Model ...
Page 4: ......
Page 5: ...PRODUCT SIZE CHART TOOLS AND MATERIALS PG 1 380 3 7 ...
Page 13: ...temperature ...
Page 14: ......