Figure 3
INSTALLATION (SHOWER HEAD)
PERFECTION IS OUR TRADITION™
pg. 8
Place and align the top shower panel with the pre-drilled holes on the top side of the wall
mounted panel.
Using the screws and washers provided, secure the top panel with the wall mounted panel.
Once the top panel is set in place you can continue with the wall mounting process.
Step 3A
Step 3B
Step 3C