-ANF01 3/4-
DP
DN
24V
0V
POWER IN
SLAVE
LG
24V
0V
L
N
FG
~
DP
DN
24V
0V
DP
DN
DP
DN
24V
0V
DP
DN
ANF-01
24V
0V
L
N
FG
~
24V
0V
24V
0V
PE
ANF-01
ANF-01
DP
DN
24V
0V
LG
DP
DN
24V
0V
DP
DN
DP
DN
24V
0V
DP
DN
DP
DN
DP
DN
24V
0V
DP
DN
24V
0V
24V
0V
L
N
FG
24V
0V
24V
0V
PE
24V
0V
24V
0V
PE
DP
DN
24V
0V
DP
DN
24V
0V
A
B
POWER IN
SLAVE
POWER IN
SLAVE
~
In a power supply system from a certain power source, if the total length of DP, DN, 24V and 0V lines in parallel connection exceeds 50m, the
ASLINK filter ANF-01 should be connected in series to the 24V and 0V terminals at a position where the parallel connection starts.
This filter should be inserted in both cases: batch power supply from a power source for the master unit, and power supply from a local power
source.
[How to Use the Filter]
■
Connection example
To ensure conformity to the CE standard, insert the ANF-01 filter regardless of the distance of lines
in parallel connection.
Terminator
Terminator
General-purpose power
supply filter
(Use it if necessary.)
24V DC stabilized
power supply
If the total length of the section where all the DP, DN, 24V, and 0V lines run in parallel is more than 50m
AnyWireASLINK master
AnyWireASLINK master
General-purpose power
supply filter
(Use it if necessary.)
24V DC stabilized
power supply
②
Local power supply/branching
If the total length of the
section where all the
DP, DN, 24V, and 0V
lines run in parallel is
more than 50m
24V DC
stabilized
power supply
General-purpose power
supply filter
(Use it if necessary.)
2-wire
terminal
2-wire
terminal
4-wire
terminal
4-wire
terminal
4-wire
terminal
4-wire
terminal
4-wire
terminal
4-wire
terminal
If the total length of the sections (A + B)
where all the DP, DN, 24V, and 0V lines
run in parallel is more than 50m
①
Power supply to the entire system
2-wire
terminal
4-wire
terminal
4-wire
terminal