background image

 

Edition 1, 2003 

 

   

 
 

 

 
 

Contents 

 

 

1.  

Contents of the manual injector kit................................................. ...................    2  

2. 

Removal protective plastic covers ................................................. ...................    3 

3.  

Mounting bracket on DECADE II........................................................................    4 

4. 

Mounting valve on bracket.............................................................. ...................    5 

5.  

Insertion of valve switch and  mounting the needle port................. ...................    6 

6.  

Mounting sample loop and other HPLC connections...................... ...................    7 

7. 

Completed valve configuration....................................................... ...................    8  

8. 

Configuration of hand valve in DECADE II software....................... ...................    9 

9.  

Valve in load position...................................................................... ...................  10 

10.  

Valve in inject position.................................................................... ...................  11 

11. 

Flow diagram model C1................................................................. ...................  12

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Copyright ©2003. All rights reserved. Contents of this publication may not be reproduced in any form or by any means 
(including electronic storage and retrieval or translation into a foreign language) without prior agreement and written consent 
from the copyright of the owner.  
The information contained in this document is subject to change without notice. Manufacturer and its affiliated companies 
shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, 
performance, or use of this material. 

Summary of Contents for DECADE II

Page 1: ...Edition 1 2003 250 7004 Installation of manual injector on DECADE II ...

Page 2: ...in inject position 11 11 Flow diagram model C1 12 Copyright 2003 All rights reserved Contents of this publication may not be reproduced in any form or by any means including electronic storage and retrieval or translation into a foreign language without prior agreement and written consent from the copyright of the owner The information contained in this document is subject to change without notice...

Page 3: ...Edition 1 2003 page 2 Contents of the manual injector kit Antec P N s 250 0012 or 250 0013 micro ...

Page 4: ...Edition 1 2003 page 3 Use no screw driver or knife Remove protective plastic covers ...

Page 5: ...Edition 1 2003 page 4 Mount special valve bracket on DECADE II ...

Page 6: ...Edition 1 2003 page 5 Mount manual valve in DECADE II bracket Make sure that ports 4 5 are pointing upwards ...

Page 7: ...Edition 1 2003 page 6 Insert valve switch and mount the needle port ...

Page 8: ...page 7 Mount sample loop and other HPLC connections see connection schematics in flow diagram of C1 6 port valve drawing 4 KU 5051 00 Note port 5 and 6 shown both be connected to waste port 5 not connected in picture ...

Page 9: ...Edition 1 2003 page 8 Completed valve configuration front view ...

Page 10: ...Edition 1 2003 page 9 Configuration of hand valve in DECADE II software Go to CONFIG menu and set Valve to present toggle by or ...

Page 11: ...Edition 1 2003 page 10 Valve in LOAD position ...

Page 12: ...Edition 1 2003 page 11 Valve in INJECT position ...

Page 13: ......

Reviews: