Antaira Industrial Ethernet Switches
LNP-0702C-SFP-24 Series User Manual V1.2
13
Follow the steps below to learn how to hang the industrial Ethernet switch.
1. Use the screws to install the DIN-Rail bracket on the rear side of the industrial Ethernet switch.
2. To remove the DIN-Rail bracket, do the opposite from step 1.
3. After the DIN-Rail bracket is installed on the rear side of the switch, insert the top of the DIN-
Rail on to the track as shown below in Figure 3.2.
4. Lightly pull down the bracket on to the rail as shown below in Figure 3.3.
5. Check if the bracket is mounted tightly on the rail.
6. To remove the industrial Ethernet switch from the rail, do the opposite from the above steps.
Figure 3.3
Stable the Switch on DIN-Rail
Figure 3.2
Insert the Switch on the DIN-Rail