Performance Verification
2-12
Power Monitor Verification (Option 5)
S312D MM
PN: 10580-00195 Revision B
2-25
2-12
Power Monitor Verification (Option 5)
The following test can be used to verify the operation of the Power Monitor (Option 5).
•
Anritsu Model MG3692x Synthesized Signal Generator
•
Power Meter, Anritsu Model ML2438A
•
Site Master S312D
•
Power Splitter, Aeroflex/Weinschel Model 1870A
•
Power Sensor, Anritsu Model MA2442D
•
RF Detector, Anritsu Model 560-7N50B
•
Adapter, Anritsu Model 34RKNF50
•
RF Coaxial Cable, Anritsu Model 15NN50-1.5C
Procedure:
1.
Set the Synthesized Signal Generator output to 1 GHz CW, and the Level to +5 dBm.
2.
Power cycle the S312D while depressing the
Escape/Clear
key to set to factory preset state. Set the mode
of the S312D to Power Monitor.
3.
On the power meter, set the sensor calibration factor to 1.0 GHz.
4.
Connect the 560-7N50B detector, power splitter, MA2442D power sensor, and other equipment as shown
.
5.
On the Synthesized Signal Generator, adjust the Level so that the power meter reads
0.0 dBm
.
6.
Record the power reading of the S312D in
Table A-15, “Power Monitor Verification (Option 5)”
7.
Repeat Step
and Step
Figure 2-11.
Power Monitor Verification (Option 5) Test Setup
Summary of Contents for Site Master S312D
Page 2: ......
Page 10: ...1 4 Replaceable Parts General Information 1 4 PN 10580 00195 Revision B S312D MM ...
Page 48: ...3 7 RTC Battery Information Removal and Replacement 3 8 PN 10580 00195 Revision B S312D MM ...
Page 58: ...Test Records A 10 PN 10580 00195 Revision B S312D MM ...
Page 60: ...Test Fixture Schematics B 2 PN 10580 00195 Revision B S312D MM ...
Page 61: ......