4
Issue 1 06/02/20
Contents
Contents continued
27
27
27
27
27
28
28
28
29
29
29
29
29
29
29
30
30
31
31
31
33
33
33
33
33
34
34
36
7 Commissioning
7.1
General
7.2
Checklist Before Commissioning
7.3
Commissioning Procedure
7.3.1
Indirect Units
7.3.2
Flow Performance
7.3.3
Temperature Controls
7.3.4
Operational Faults
8 Maintenance
8.1
General
8.1.1
Maintenance Requirements
8.2
Standard Inspection & Maintenance Operations
8.2.1
Inspection
8.2.2
Safety Valve Operation
8.2.3
Strainer
8.2.4
Expansion Vessel Charge Pressure
8.2.5
Re-Commissioning
9 Troubleshooting
9.1
Fault Finding
9.1.1
Important
10 Decommissioning
10.1
Decommissioning Procedure
10.2
Environmental Information
10.3
WEEE Declaration
10.4
RoHs Declaration
11 Spare Parts
11.1
Baxi Genuine Parts List
Warranty