novAA 800
Installation and initial start-up
31
3
Installation and initial start-up
CAUTION
Prevent any unauthorized interference!
The device may only be assembled, installed and repaired by service engineers from
Analytik Jena or by technical personnel authorized by Analytik Jena.
CAUTION
Observe the safety instructions!
When installing and starting up the device, please observe the instructions provided in
the section "Safety instructions" on page 22. Compliance with these safety instructions
is a requirement for the error-free installation and the proper functioning of your AAS
measuring environment. Always observe all warnings and instructions which are dis-
played on the device itself or which are displayed by the control and analysis software
ASpect LS.
The novAA 800 will be delivered directly to the final instrument location by a transport
company. The delivery by this company requires the presence of a person responsible
for the instrument installation.
All persons designated for operating the device are obliged to attend the briefing of
the Analytik Jena service department.
The customer must ensure that the installation conditions at the place of installation
comply with the specifications stipulated by Analytik Jena.
3.1
Starting up the novAA 800 with accessories
3.1.1
Switching on sequence
1.
Switch on the exhaust unit.
2.
Switch on the PC and wait for the operating system to initialize: The application
icons appear on the screen, including the ASpect LS program icon.
3.
Switching on the novAA 800: Press the green ON/OFF switch on the right side
wall. Wait until the spectrometer has fully completed the automatic initialization
routine.
4.
Start ASpect LS: Double-click with the mouse cursor on the ASpect LS icon.
5.
Connect the printer and the compressor if they are needed.
The AAS system is now switched on; work (analysis preparation and measure-
ment) may begin.