2015
43
Operation
7
Operation
7.1
Turning On (Readiness for Operation)
1.
Check
for
correct
connection
of
power
cord
to
line
power
supply.
2.
Check
that
all
front
doors
are
closed.
3.
Transfer
On/Off
switch
into
position
"I"
(
).
Fig.
13: On/Off switch
4.
Follow
instructions
and
advice
regarding
stand-by
mode
„Touch Sensor with LED” on page 27
.
5.
Watch
operating
state
indicator
(LED):
Green
(steady):
Reports
completion
of
init
routine
and
readiness
for
operation.
6.
Turn
PC
on
and
trigger
starting
routine.
The system is ready for action and to carry out commands of the computer
controller.
Summary of Contents for 845-00003-03
Page 1: ...InnuPure C96 User Manual ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...2015 VII ...
Page 8: ...VIII 2015 ...
Page 12: ...XII 2015 ...
Page 20: ...8 2015 General Information ...
Page 44: ...32 2015 Technical Description ...
Page 54: ...42 2015 Routine Start Up Procedure ...
Page 60: ...48 2015 Operation ...
Page 64: ...52 2015 What to do if ...
Page 72: ...60 2015 Shutting Down ...
Page 76: ...64 2015 Waste Disposal ...