![Analytic Systems BCD310 Series Installation & Operation Manual Download Page 7](http://html1.mh-extra.com/html/analytic-systems/bcd310-series/bcd310-series_installation-and-operation-manual_2940505007.webp)
7
POWER CONNECTION
The unit is supplied with power leads 1 meter long. This should normally be adequate to
connect to a source of power. If you must extend the power leads, be sure to use at least a
good quality (typeTEW) AWG12 wire. The wire colours are:
Red - Positive
Black - Negative
All connections should be made inside an appropriate junction box. Refer to the
specifications table for the correct sizing of the circuit breaker in the distribution panel.
A ground stud is provided to bond the chassis to local ground to reduce or eliminate EMI.
To ensure spark free connections the power switch must be in the OFF position prior to
making the connections to the battery bank(s).
The unit may be hooked to 1, 2 or 3 battery banks. If you are hooking up 2 or 3 battery banks
keep in mind that they MUST share a common ground! If you are hooking up 3 battery
banks, hook them up as is shown below.
OUTPUT 1
OUTPUT 2
OUTPUT 3
BATT
BANK #2
BATT
BANK #1
BATT
BANK #3